top of page

 

 

 

 

Mitchellwest designed and supplied a temporary power solution for high end overseas leisure industry client . Mitchellwest shipped all materials to complete the project from UK Mainland. Work involved supply and installation of acoustic room, three diesel generators associated cabling and control panels along with bulk fuel tank and associated equipment.

All installation works and commissioning were carried out by Mitchellwest

The clients ultimate goal was to achieve a noise levels of 55 dBA @ 1mtr. We were able to improve on this level and the finaL result achieved as 50 dBA @ 1mtr. 

A fire suppression system was also supplied and installed by Mitchellwest.

Supply,Installation and commissioning of purpose built acoustic room for 375kVA Diesel Generators, control panels, bulk fuel tank and fire alarm system

bottom of page